You may jest but a pal of mine wanted let's say 12m of plastic conduit for whatever job he was. designing, and duly filled in a chiti. A while later someone came to say his stuff had arrived so he said "stick it down there under my desk", and the baffled guy said "you're 'avin a laugh, there's a truck load of it" He went down and sure enough a truck load, and two more trucks waiting for space. It turned out he'd ordered 12 "lots" rather than metres and a "lot" was a large bundle of long lengths of the stuff. Apparently it was all used up eventually over a number of years. One reason he didn't spot it was that he'd order from a part number book but didn't have sight of the prices, so he'd not spotted that couple of thousand quid was a bit steep, but was within his budget.
Different guy at the same place had accidentally ordered 7m of 200 core cable rather than 200m of 7 core. The suppliers had made it as a special order a d even had to make an extra large drum to wind it onto as it was the thickness of an elephant's trunk. Being only 7m long it was no use at all even if there'd been a subsequent need for 200 core cable.
.