In my town:
Sign: "A78 completely closed to all traffic, Friday 8pm til 6am Monday at power station for resurfacing. Use diversion”. That’s about 8 miles north of here,
Leaving the town, where the A78 joins the bypass: "A78 completely closed Friday 8pm til 6am Monday at power station for resurfacing. Use diversion” - and a big “Right Arrow”.
Next village: "A78 completely closed Friday 8pm til 6am Monday at power station for resurfacing. Use diversion” - and a big “Right Arrow”.
Leaving that village:
“A78 closed, 1 mile ahead. Local traffic only."
Half a mile further on: cones across most of the road, sign “A78 closed at power station. Local access only.
Half a mile further on: Cones and barriers across the whole road. No Entry signs. Road closed signs. Flashing lights. CCTV. And a guy manning the barricades. Beyond that, a swarm of trucks and resurfacing machines.
There’s a bike route down a bridleway, so bikes can get through.
I was stopped there for a couple of minutes - during that time, at leats 6 cars drove up, past all the signs, cones and bollards. Some did sheepish U-turns and headed back, others gave the roads guy a mouthful of abuse.
So did they not see the signs and bollards, or did they assume that they were only meant for other people....?
Good 50k ride :-)