That is incredibly cheap
Yep I’d say !! Add £4k onto that for our quotes
That is incredibly cheap
Is anyone else having trouble getting hold of batteries?
Thats your generation meter that will show whether you are importing from the grid or exporting to the grid and if so how many kWh. That’ll show on the LED display.
Did the installer not leave any documentation?
I would think that the LED flashing is just a confirmation of connection But it may flash different colours depending upon import or export.
Can’t find anything in my papers but this from the web:Yes lots of people, some people are holding out to get the batteries they ordered, others are accepting whatever their supplier can get them, we were quoted a 5.3kWh (I think) but they fitted a 6.2kWh one as the container with the 6.2's arrived before the 5.3's.
Our system was installed last Monday, still not up & running correctly as there is an issue with one of the units, however for those that have a system installed we have a unit in the cupboard with a LED screen & a occasional red flashing LED, what does the flash indicate?
View attachment 658853
We had ours done about a month ago - but they are having trouble getting the batteries
They are being reasonable and have not charged us for them until they can fit them
Is anyone else having trouble getting hold of batteries?
That & there is no stock with no end in sight of it getting better, so maybe they are concentrating on what they have.Still waiting on quotes coming back …. I think business must be busy and don’t need anymore work ?
That & there is no stock with no end in sight of it getting better, so maybe they are concentrating on what they have.
True. May have missed the boat