gbb
Squire
- Location
- Peterborough
A little late, but no cycling for me yesterday....kitchen upgrades
New worktops, new sink , rip a 'built in' larder out (dry lined and timber frame, that took 2 hours), move several appliances, move a multitude of pipework.
14 hours (with breaks and clean up time included)
Still got to finish the walls where ive taken out the larder...some patching and finishing plaster work.
Still got to rip up the ceramic floor tiles and lay a wood floor
Still got to decorate kitchen and diner...and a multitude of odds and sods that will still need doing.
On top of that, bloody busy at work, so i cant see much mileage for me for a few weeks.
New worktops, new sink , rip a 'built in' larder out (dry lined and timber frame, that took 2 hours), move several appliances, move a multitude of pipework.
14 hours (with breaks and clean up time included)
Still got to finish the walls where ive taken out the larder...some patching and finishing plaster work.
Still got to rip up the ceramic floor tiles and lay a wood floor
Still got to decorate kitchen and diner...and a multitude of odds and sods that will still need doing.
On top of that, bloody busy at work, so i cant see much mileage for me for a few weeks.