After 3 years of weeding gravel footpaths we've decided it's time we take the nuclear option! So we're planning on digging up small, manageable sections, laying weed control sheets down and then regravelling. Possibly woodchip, but probably better with gravel.
Now it's a question of how deep do we dig and can we sieve the existing gravel out to reuse as much as possible. I don't think it was deep enough so whatever we will need to buy gravel. How deep should the gravel be over the sheets?
This is going to be a lot of work so we're planning on doing a little bit at a time. We can take our time I reckon.