Cream Crackered

Page may contain affiliate links. Please see terms for details.

Drago

Legendary Member
In the last 4 days I've laid a base, assembled a 4 x 5 M log cabin, carpeted it and I've just finished the electrics. Currently enjoying a cold Perregrino while I wait for the sparky to test the electrics and certify them so I can throw the levers on the consumer unit and bring it officially online.

I am absolutely exhaustipated and ache in places I never knew existed.
 
God sake man, what was the wife doing?
 
[QUOTE 3729266, member: 259"]Aren't they still classed as a protected species?[/QUOTE]
I thought it was something unseemly!
 

Cyclist33

Guest
Location
Warrington
In the last 4 days I've laid a base, assembled a 4 x 5 M log cabin, carpeted it and I've just finished the electrics. Currently enjoying a cold Perregrino while I wait for the sparky to test the electrics and certify them so I can throw the levers on the consumer unit and bring it officially online.

I am absolutely exhaustipated and ache in places I never knew existed.

Loser... Get out on yer bike!
 

raleighnut

Legendary Member
:bravo: I take it there will be a couple of bike brackets on the wall to 'store' a couple of the favourite steeds. :becool:
 
OP
OP
Drago

Drago

Legendary Member
Here you go...
 

Attachments

  • P_20150604_205259.jpg
    P_20150604_205259.jpg
    149.7 KB · Views: 117

Mrs M

Guru
Location
Aberdeenshire
In the last 4 days I've laid a base, assembled a 4 x 5 M log cabin, carpeted it and I've just finished the electrics. Currently enjoying a cold Perregrino while I wait for the sparky to test the electrics and certify them so I can throw the levers on the consumer unit and bring it officially online.

I am absolutely exhaustipated and ache in places I never knew existed.
Just wait 'till you have to paint it, ours took 3 weeks. :heat:
 
Top Bottom