Drago
Legendary Member
- Location
- Suburban Poshshire
In the last 4 days I've laid a base, assembled a 4 x 5 M log cabin, carpeted it and I've just finished the electrics. Currently enjoying a cold Perregrino while I wait for the sparky to test the electrics and certify them so I can throw the levers on the consumer unit and bring it officially online.
I am absolutely exhaustipated and ache in places I never knew existed.
I am absolutely exhaustipated and ache in places I never knew existed.