Apparently it cost £1500000 to remove the painted on windows and wooden funnels when it was launched 😁 to make it look good
Good grief lol
> But the new ferry won't be sailing from Ardrossan - the main port of choice for the island. The design of the new ship means it can't berth at the North Ayrshire port until a major redevelopment is carried out. and Instead, the Glen Sannox - and sister ship MV Glen Rosa, which has yet to enter service - will set sail from Troon, with a longer crossing time for island residents and visitors.
https://www.ayradvertiser.com/news/...v-glen-sannox-set-take-passengers-first-time/
Good grief lol
> But the new ferry won't be sailing from Ardrossan - the main port of choice for the island. The design of the new ship means it can't berth at the North Ayrshire port until a major redevelopment is carried out. and Instead, the Glen Sannox - and sister ship MV Glen Rosa, which has yet to enter service - will set sail from Troon, with a longer crossing time for island residents and visitors.
https://www.ayradvertiser.com/news/...v-glen-sannox-set-take-passengers-first-time/
I'd heard the plywood was sold and the cash raised used to buy a motorhome.
7 years late and a massive £300M over budget (should have cost £100M but cost over £400M).
Oldwheels will be turning in his grave
Topic title is wrong, it was launched years ago, that's part of the problem.
Today was its first day of service with passengers.
How about US engineers cocking up the Mars Climate Orbiter project because some worked in imperial units and some in metric and assumptions were made about who was using what?!