Rohloff_Brompton_Rider
Formerly just_fixed
hi all,
just thought i'd let you know how the brompton (16 inch wheeled folder) performed on dirty muddy bumpy canals.
i intended to complete the leeds liverpool canal, end to end.
i started at leeds lock 1 at 06:30hrs
i took a wrong turn in wigan, ended up in leigh via another canal and
finished at the barton swing aqueduct via the bridgewater canal. totaling 115
miles according to bikehike.co.uk.
i'm very very tired. the brompton performed faultlessly. it was single track for at
least 40 miles, very very muddy in places. the stock saddle is now squished
flat.
i chose the wrong bike for the ride, but the right one for a lift to the start
and home from the end.
it was so rough in places i was thrown from the saddle.
i have completed the 'mary townley loop' twice on my mtb and that was hard,
today's ride was far harder, there is hardly any respite from the pedaling.
the paths were mostly made up, but at least 30 to 40 miles overall were not made
up at all, like little roller coaster mud rides thru, effectively what were fields.
well done to the brompton.
for anybody wanting to to the leeds liverpool end to end, TAKE THE RIGHT HAND BRANCH AT WIGAN!!!
the bridgewater canal towpath is not a pleasant place to be.
it took me 13 hours of non stop grueling pedaling. there is no respite from pedaling, you stop pedaling, you stop moving.
next time i do it, it will be on my scott.
just thought i'd let you know how the brompton (16 inch wheeled folder) performed on dirty muddy bumpy canals.
i intended to complete the leeds liverpool canal, end to end.
i started at leeds lock 1 at 06:30hrs
i took a wrong turn in wigan, ended up in leigh via another canal and
finished at the barton swing aqueduct via the bridgewater canal. totaling 115
miles according to bikehike.co.uk.
i'm very very tired. the brompton performed faultlessly. it was single track for at
least 40 miles, very very muddy in places. the stock saddle is now squished
flat.
i chose the wrong bike for the ride, but the right one for a lift to the start
and home from the end.
it was so rough in places i was thrown from the saddle.
i have completed the 'mary townley loop' twice on my mtb and that was hard,
today's ride was far harder, there is hardly any respite from the pedaling.
the paths were mostly made up, but at least 30 to 40 miles overall were not made
up at all, like little roller coaster mud rides thru, effectively what were fields.
well done to the brompton.
for anybody wanting to to the leeds liverpool end to end, TAKE THE RIGHT HAND BRANCH AT WIGAN!!!
the bridgewater canal towpath is not a pleasant place to be.
it took me 13 hours of non stop grueling pedaling. there is no respite from pedaling, you stop pedaling, you stop moving.
next time i do it, it will be on my scott.